|
Semi-Automatic Concrete Compression Machines by Controls |
|
|
|
|
Written by Administrator
|
|
Friday, 18 August 2006 22:45 |
|
Includes both standard and high-standard machines:
Standard semi-automatic machines The standard semi-automatic machines meet Australian Standard requirements, are designed for use in both the field and laboratory, and offer excellent value for money. Semi-automatic machines require little manual intervention by the operator.
Download PDF brochure.
| |
High-standard semi-automatic machines
The high-standard semi–automatic machines meet Australian Standard requirements, but also conform to the new higher EN standards and are tested for stability. Upgrade options include a two way valve for second frame connection, power pump cabinet, basement (pedestal), block platens and side rail carriages.
Download PDF brochure.
|
|
|
Last Updated on Monday, 02 April 2007 19:22 |